Previous
Next
  • Client

    AySA - Agua y Saneamientos Argentinos S.A.

  • Country

    Argentina

  • Location

    Pcia. de Buenos Aires

  • Area

    Water Treatment

  • Year

    2020-2024

Type of work: Construction Inspection 

The contract consists of the Inspection of the construction of the Subterranean River Section I and Elevator Station. The works consist of a pipeline with an internal diameter of 3.90 m and a length of 13.54 km, to be executed by TBM tunneling machine, from the AySA Water Treatment Plant in Bernal, Quilmes district, to the town of Temperley, in the Lomas de Zamora. At the end of the tunnel, a lifting station will be built that will improve the supply of drinking water to the districts of Lomas de Zamora, Almirante Brown and Esteban Echeverría in Greater Buenos Aires.