Previous
Next
-
Client
AySA - Agua y Saneamientos Argentinos S.A.
-
Country
Argentina
-
Location
Pcia. de Buenos Aires
-
Area
Water Treatment
-
Year
2020-2024
Type of work: Construction Inspection
The contract consists of the Inspection of the construction of the Subterranean River Section I and Elevator Station. The works consist of a pipeline with an internal diameter of 3.90 m and a length of 13.54 km, to be executed by TBM tunneling machine, from the AySA Water Treatment Plant in Bernal, Quilmes district, to the town of Temperley, in the Lomas de Zamora. At the end of the tunnel, a lifting station will be built that will improve the supply of drinking water to the districts of Lomas de Zamora, Almirante Brown and Esteban Echeverría in Greater Buenos Aires.