Opening of LEAT 345 KV Cobos-Andes, Altiplano Sectioning Station and complementary works

Type of work: Technical assistance and Inspection of works 

The service included the review of the detailed engineering, technical assistance and inspection of the works that included the opening of the LEAT 345 KV Cobos-Andes and the construction of the new Altiplano 345 KV Sectioning Station (ES), with the purpose of interconnect the Cauchari I, II and III Solar Parks (Total power: 300 MW). The works included their corresponding assembly of GIS 345 KV Power equipment, of the AC and DC Auxiliary Service Transformers, their primary and secondary connection; Control Boards, auxiliary boards and cabinets associated with them, Battery chargers, stationary batteries, etc.

Ezeiza International Airport – Landside

Type of Work: Preparation of technical documentation – Executive Project. Suitable for bidding and contracting of work. 

The works included the following specialties: • Structures; • Thermomechanical installation (air conditioning, heating and ventilation); • Installation of drinking water and sewers; • Storm drains; • Installation of gas; • Installation against fire; • Fire detection installation; • Roads; • Traffic study; • Geotechnics; • Topography; • Demolitions; • Coordination of facilities; • Schedule of work agreed with Estudio Arq. MSGSSS and AA2000. These specialties apply to the following buildings: • New Provisional Terminal (Canceled); • New control tower; • APRON / New Fire Terminal; • New Main Terminal (approximately 150,000 m²); • New service and escape tunnels; • Energy house; • New level parking; • Re-functionalization of the current Departures Terminal as Domestic; • Bridges over the Ricchieri motorway and over the underground railway line.

Hospitals: Ramos Mejía; Álvarez and Dentistry

Type of work: Supervision of works. 

The consulting tasks carried out were the following: Engineering Review; Management planning and control; Supervision of works and administration of contracts and preparation of reports.

132 kV interconnection El Pluma – Perito Moreno – Los Antiguos

Type of Work: Basic Engineering and Technical Assistance

Basic engineering review of: 

LAT 132 kV El Pluma-Perito Moreno; 132 kV LAT Perito Moreno-Los Antiguos; ESyM El Pluma; ET Perito Moreno; ET The Ancients.

Execution of basic engineering of;

LMT 2×33 kV Perito Moreno-Los Antiguos and ET Los Antiguos for 33/132 kV.

Full budget of the works.

“W” Hotel, Florida, US

Type of Work: BIM modeling and computation with scope LOD 200 of elements of the building’s facades.

The hotel is located a few kilometers from the commercial center of Miami, on Bizcayne Bay.

Subway Line “D”: Carranza – Congreso de Tucumán

Type of Work: Project review and technical-administrative inspection of the works. 

Tunnel (excavation, napa depression, concreting); Stations (excavation, submurations, napa depression, concreting, masonry, enclosures, interior architecture, platforms, hallways, entrances); Electrical, sanitary and service installations; Laying of catenaries along the entire length of the extension. Renewal of tracks in partial sections between the Catedral and Palermo stations and extension of tracks from Est. Carranza to Congreso de Tucumán. Renovation of the signaling systems between the Catedral and Ministro Carranza stations and extension of the systems from M. Carranza to Congreso de Tucumán. Renovation of the Santa Fe substation. Expansion of the Carlos Pellegrini and Plaza Italia substations. Colegiales sub-plant equipment and related works. Provision and installation of rolling ladders.

Transmilenio 26th Street – Bogotá

Type of work: Direction and Inspection of Works. 

Supervision of the adaptation of Carrera 10 (Fernando Mazuera Av.) to the Transmilenio System in section 4 between 7th street and 26th street, in Bogotá D.C. and section 5 between Calle 26 and Calle 34, in Bogotá D.C. and Adaptation of Calle 26 (Avenida Jorge Eliécer Gaitán) to the Transmilenio System in section 5 between Carrera 19 and Carrera 13, including operational connection with the Caracas Trunk, in Bogotá D.C. and in section 6 between Carrera 13 and Carrera 3 and Carrera 3 between 26th street and 19th street, in Bogotá D.C. Supervision of the construction of roads on flexible and rigid pavement, improvement and construction of public space, construction and rehabilitation of aqueduct and sewerage networks, public services networks (Natural Gas, Telecom, ETB, EPM and Codensa), signaling and Social Auditing and environmental.

Sweep and Trash Inspection

Type of work: Inspection of public services.

Inspection of public services. The works consist of the inspection and comprehensive control of the public urban hygiene service, which includes waste collection, sweeping and other related tasks performed by the company hired for this purpose. Most of the tasks are carried out through the application of computer systems consisting of a GIS application with a GPS positioning system with data transmission using GPRS technology. As soon as deficiencies in the service are detected, they are transmitted online to the operations base. The system generates the daily and monthly reports, and the calculation of all the indices of provision of each urban hygiene service provided by the Contractor.

Drinking water of the Dem. Republic of the Congo (Ex-Zaire)

Type of work: Preliminary projects, executive projects and studies of sources for the provision of drinking water and electricity. 

Campaign work: general surveys; population surveys. Hydrological studies including drilling, pumping tests; Topographic surveys, chemical and bacteriological analyzes with our own equipment in the localities of Lodja, Lomela, Kole, Katako – Kombe, Basoko, Opala, Ubundu, Djolu, Ikela, Bokungu, Lubutu, Punia. Preliminary projects for drinking water supply systems: pumping of underground water in 11 of the 12 localities (in the 12th intake in a river); Treatment plants; drinking water storage and distribution facilities. Preliminary draft of electrical energy production and distribution systems and public lighting. Preliminary draft of administrative offices and houses for staff rooms. Executive projects and specifications for the call for bids for the works.

Ezeiza International Airport – Departures Terminal “A” and Underground parking lot

Type of work: Detailed engineering. 

a) Departures Hall: total area of 25,000 m² (basement, ground floor and upper floor)

b) Parking Beach on 3 (three) levels, 2 (two) of them underground with a total area of 14,000 m².

c) Remodeling of a 3,000 m² area of the Waiting Hall for boarding the current International Breakwater. Access roads to the new set of works, including storm drains, vertical signage and lighting, covering an area of 11,000 m² of pavements. Emission of approx. 600 (six hundred) documents.