Name: Detailed Inspection and Engineering Department for the Limay River Hydroelectric Project in Alicurá
Brief description: 115 m high earth dam with a capacity of 12,000,000 m³. Intake and spillway for 3,000 m³/sec. 1,000,000 kW hydroelectric plant. Discharge channel. Temporary village. River diversion works through two 2,000 m long, 9.00 m diameter tunnels. a) Review and adjustment of the Executive Project; b) Technical assistance; c) Preparation of detailed civil works plans, installation of machinery and electromechanical equipment; e) Technical and administrative management; f) Inspection; g) Technical assistance during plant commissioning and the warranty period.
Location: Neuquén and Río Negro Provinces, Argentina.
Year: 1975-1995
Client: Hidronor S.A.