Expansion of Av. Gral. Paz

Name: Executive project for the expansion of a section of General Paz Avenue
Brief description: Works for the remodeling of General Paz Avenue, elevating it to urban highway status. Length: 5.2 km. Topographic surveys, soundings, tests; executive design for the layout, basic works for interchanges, bridges, and pavements; calculations and budgets; complementary specifications.
Location: Autonomous City of Buenos Aires.
Year: 1971-1972
Client: Dirección Nacional de Vialidad

Miami Cruise Terminal, Florida, US

Name: Miami Cruise Terminal, Florida, USA
Brief description: Design of the building’s façade elements based on a third-party BIM model. The cruise terminal, belonging to a major shipping line, will be able to accommodate two large vessels simultaneously, while the terminal will have a capacity of 28,000 passengers.
Location: Miami, United States of America
Year: 2021
Client: Fourzero

Low level crossing of Piedrabuena and Cafayate with Belgrano Sur railway

Name: Preliminary design and environmental impact study for the Piedrabuena and Cafayate underpasses with the Belgrano Sur railway
Brief description: The work included a topographic survey, photographic survey, tree species survey, identification of interferences to be removed, geometric design, structural analysis, hydraulic design, architecture, lighting, a pumping station with electromechanical equipment, and pavement and signal design.
Location: Autonomous City of Buenos Aires. Argentina.
Year: 2016-2018
Client: Autopistas Urbanas S.A. (AUSA)

Underground railway Sarmiento

Name: Review of the engineering for the civil works and installations of the tunneling of the Sarmiento Line railway corridor. Stages I, II, and III. Sections: Caballito-Haedo; Haedo-Castelar and Castelar-Moreno.
Brief description: The modernization of this system has as its main objective the renewal of rolling stock, the modernization of civil infrastructures, the improvement of the architectural and environmental integration of the infrastructures, and the adaptation of the railway installations.
Location: Autonomous City of Buenos Aires and Province of Buenos Aires, Argentina.
Year: 2012
Client: Administración de Infraestructuras Ferroviarias Sociedad del Estado (ADIFSE).

Low level crossing of Murguiondo and Larrazábal av. with Belgrano Sur railway

Name: Preliminary design and environmental impact study for the Murguiondo and Av. Larrazábal underpasses with the Belgrano Sur railway
Brief description: The work included a topographic survey, photographic survey, tree species survey, identification of interferences to be removed, geometric design, structural analysis, hydraulic design, architecture, lighting, a pumping station with electromechanical equipment, and pavement and signal design.
Location: Autonomous City of Buenos Aires, Argentina
Year: 2016-2018
Client: Autopistas Urbanas S.A. (AUSA)

Renovation of Belgrano Railway – Sections V and VI

Name: Review of the executive project and inspection of the track structure renovation works on the General Belgrano railway, Sections 5 and 6, branch C6 and branch C3.
Brief description: Supervision of activities inherent to this type of work (cleaning of the section and conditioning of channels and culvert beds; existing rail inspection; removal of existing track; formation of the new subgrade and transverse profile of the track area, etc.). The work included monitoring the environmental management plan and controlling hygiene and safety in the contractor’s work.
Location: Province of Chaco, Argentina.
Year: 2017-2020
Client: Administración de Infraestructuras Ferroviarias Sociedad del Estado (ADIFSE).